Lineman Construction (Distribution)


Course Material

  • Introduction to PPE pdf
  • Creating of Safety Zone pdf
  • LT AB Cable Erection pdf
  • Erection of Pole Mounting pdf
  • Earthing or Grounding pdf
  • Underground Cable Laying pdf
  • High Voltage Distribution pdf
  • Possible Hazards and Accidents pdf
  • Emergency Handling and First Aid pdf
  • Work Effectively with Others Part 1 pdf
  • Work Effectively with Others Part 2 pdf

Presentations

  • Introduction to PPE  pdf
  • Creating of Safety Zone  pdf
  • LT AB Cable Erection  pdf
  • Erection of Pole Mounting  pdf
  • Earthing or Grounding  pdf
  • Underground Cable Laying  pdf
  • High Voltage Distribution  pdf
  • Possible Hazards and Accidents  pdf
  • Emergency Handling and First Aid  pdf
  • Work Effectively with Others Part 1  pdf
  • Work Effectively with Others Part 2  pdf

 

Videos

 

Topic

Watch Video (English)

Watch Video (Hindi)

Watch Video (ILT)

Introduction to PPE

   

 

Creating of Safety Zone

           

LT AB Cable Erection

             

Erection of Pole Mounting

                         

Earthling or Grounding

                               

Underground Cable Laying

                   

High Voltage Distribution

                   

Possible Hazards and Accidents

                   

Emergency Handling and First Aid

                   

Work Effectively with Others Part 1

     

Work Effectively with Others Part 2